North Terminal Renovations
BACKGROUND
The Greater Orlando Aviation Authority (GOAA) is committed to enhancing the look and feel of Orlando International Airport (MCO) into the next decade.
Following the “People” pillar, the Aviation Authority is moving forward with plans to renovate the interiors at Airsides 1 & 3 along with the interior renovation of Levels 2 & 3 at Terminals A & B.
In the spirit of major renovations to the landside Terminals A & B in 2018 and the completion of Terminal C in 2022, the Authority’s goal now is to bring the remaining facilities up to those elevated standards. The scope will consist of the design and construction of Landside and Airside interior renovation, and will include new flooring, new wall finishes, and new ceilings with lighting improvements. The existing restrooms at all four Airsides of the A & B Terminals will also be refurbished to meet the new elevated standard set in Terminal C.
PROGRAM COST: $351 Million total
PROGRAM TIMELINE: Varies
PROGRAM FACTS: Airside Restroom Renovation, and Airside 1&3 Interior Refurbishment are current projects included in the program.
Terminal A & B Interior Renovation for Landside, Levels 2 & 3
The goal is to enhance the passenger experience in these terminals by providing new interior finishes, seating, wayfinding, and lighting improvements for the Bag Claim Level and new flooring improvements on Level 2 and Level 3 including a newly renovated Level 3 food court to support the new concessions program. Projected timeline:
- Anticipated Design Start 2027
- Anticipated Construction Start 2028
- Anticipated Substantial Completion 2030